Turned over.
Still running.
Ten representative installations from the projects we have completed and handed over across Cebu — commercial offices, barangay halls, a police station and private residences. Every figure below is the system as built.
Subangdako Barangay Hall & Police Station
Our largest turned-over installation: 68 kW of hybrid solar backed by 64 kWh of storage, keeping a barangay hall and its police station operational through outages.

A public building that stops losing power
Barangay halls and police stations are exactly the buildings that cannot afford an outage — records systems, radios, lighting and refrigeration all matter most precisely when the grid is under stress. A hybrid configuration was specified so the site carries its own load through the day and rides through interruptions on stored energy.
The scope ran the full EPCT sequence: engineering and load analysis, procurement, construction and installation, then system testing and commissioning with complete documentation at turnover.
Offices, complexes and public buildings.
Mixed hybrid and grid-tie arrays where daytime load is heavy and downtime is expensive.

4D Ventures Mining Company
A 42 kW mixed hybrid and grid-tie installation across the office building roof in Hernan Cortes, sized against the company’s daytime operating load.

Red Viper Ventures Corp
29 kW of mixed hybrid and grid-tie solar on the commercial office of a construction and development company.

Mantuyong Barangay Hall
32 kW peak hybrid set-up with 64 kWh of battery backup — public service that keeps running when the grid does not.

Pyong Yu Commercial Complex
24 kW hybrid with 32 kWh of backup storage for a commercial complex in Minglanilla, south of Cebu City.

Commissioning & documentation
Every installation is tested, inspected and handed over with complete project documentation — the part of the job that outlives the scaffolding.

Battery energy storage
Banks from 16 kWh to 64 kWh delivered across residential, commercial and government sites — configured and tested before commissioning.
Homes that ride through brownouts.
Hybrid systems with storage sized against the household’s real critical load — not a round number on a brochure.

Private residence — Mandaue City · 16 kW hybrid
A 16 kW hybrid set-up with 64 kWh of backup storage using LvTopsun 314 Ah (51.2 V) batteries — one of the largest residential storage banks we have commissioned.

Private residence — Cebu City · 12 kW hybrid
A 12 kW hybrid system with a 16 kWh battery — proportioned so the household keeps its essential circuits running without over-buying storage it would never cycle.

Private residence — Liloan · 10 kW hybrid
A 10 kW hybrid set-up with 32 kWh of backup storage, keeping the household running through outages in Liloan.

Private residence — Mandaue City · 6 kW hybrid
A 6 kW hybrid system with 20 kWh of battery storage — sized to carry the essential circuits rather than the whole house.

Private residence — Mandaue City · 12 kW hybrid
A 12 kW hybrid system with 48 kWh of backup storage, one of the larger residential banks we have commissioned.
What we have put on Cebu roofs.
Covering the solar projects Solar Shift has completed and turned over to date across residential, commercial and government sites.
Your site could be the next one here.
Send a recent electricity bill and tell us what the building has to keep running. We will come back with a system, a specification and an itemised quote.